The
land Requirement for ALDS :
Plot
size requirement minimum 10000 sq ft in city area, 14500 sq
ft on state highway, 20000 sq ft
On
national highway.
Frontage
minimum 100 ft.
There
should be no public gathering place like theater, marriage
hall, school, hospital, etc within 100 mtr radius.
There
should not be any overhead electrical transmission line passing
through the plot.
On
national highway, there are certain other constraints like
minimum distance from existing fuel Station,
from intersection, etc and they differ according to location
of the plot whether it is in urban stretch, rural stretch
or rolling stretch and this can be verified by inspection
of site.
Scope
of Work - CPIL
Preparation
of layout Drawing, Documents and pre approval from CCOE
Layout
& Supervision of Civil Work
Supply
& Installation of Mechanical & Electrical items as
per company’s quotations
Safety
Certification of Installation under Rule 33 from competent
Authority as per CCOE requirement
Commissioning
& Trial Run of ALDS
Training
to Staff for effective running of ALDS
Scope
of Work – CLIENT
Obtain
DM-NOC, Road Access permission if land situated on NH/SH
All
Civil Work of the ALDS
Arrange
for Electricity supply (3 phase, 15 HP), Water Supply
Provide
Temp shed/godown, Security during installation of ALDS
Optional
items Canopy, Totempole, Air Dispenser, Pre-fabricated Sales
Office |